William, a logistician, needs to route a freight train that is 20 feet at its tallest point and 10 feet at its widest point within 3 days. The most direct path includes a single-track tunnel that needs 24 hour notice prior to use. If the tunnel is roughly modeled by f(x)=-0.x^2+3.2x-3.5, should William make arrangements for the train to use the tunnel?

Q&A Education