hussain45alazawi hussain45alazawi 02-04-2024 Engineering contestada Q1) In trigonometric levelling, the theodolite was setting between two points A and B with height 1.62 m above groundThen observed the staff in each point and recorded data as given below. Compute the difference in elevations between these points