Determine the amount of excavation needed for the continuous footings shown below. A two-foot working distance is required, and the excavation will be sloped 1:1.75 (1.75 vertical feet for every horizontal foot). Also, determine the amount of backfill needed for the continuous footing and foundation in compacted cubic yards.

Q&A Education