According to the building code, masonry footings shall extend at least 4' below finished grade. The PRIMARY reason for this is to:
1) get below the frost line
2) make the foundation stronger
3) keep water out of the basement
4) reach a lower soil strata where better bearing material can be found

Q&A Education