An all-equity firm is considering the following projects: project beta expected return a 0.4 6.5% b 0.9 9% c 1.5 16% the t-bill rate is 3 percent, and the expected rate of return on the market is 10%.

a. which project(s) should be accepted and which project(s) should be rejected ?

Q&A Education