With this method, it does not matter in what sequence the arrows are drawn, as long as the direction of each arrow is maintained when it is transposed.
a) PERT (Program Evaluation Review Technique)
b) CPM (Critical Path Method)
c) Gantt Chart
d) Work Breakdown Structure (WBS)

Q&A Education