What is a Monte Carlo assessment?
a. Game of chance
b. A programing procedure where the probability of outages and repair times are modeled by simulations with random numbers.
c. A deterministic procedure.
d. A probabilistic assessment by direct determination.
18. We are evaluating a 500 MW solar farm. We know that the solar farm has a 50% TDF (Shift factor) over a critical line and that at noon time (when the PV would be at maximum) this line could be loaded (before the solar farm) at 400 MVA under contingency. We also know that the line has a 600 MVA emergency limit. What is the maximum output allowable for the PV to prevent the line to overload if the contingency were to happen?
a. 100 MW
b. 200 MW
c. 300 MW
d. 400 MW
19. If we want to dispatch the solar farm at full capacity, what options would you consider?
a. Implementation of a Remedial Action Scheme that would reduce the plant's output if the contingency were to happen.