Duck Construction has proposed two alternatives for constructing a new bridge in Oregon. Based on data from recent bridge construction projects of comparable size, the estimated costs for each alternative are given below. Use the conventional B-C ratio method, with PW as the equivalent-worth measure, to determine which alternative should be selected at an interest rate of 9% per year. Assume a study period of 35 years.

Q&A Education