Prepare quantity takeoff and production of excavation work from your own project.
Clarify the detailed geotechnical report of your project and prepare the quantity takeoff and production of required caisson piles. In case there is no caisson pile are not needed in your project use 60 KSI 14" diameter steel caisson plies spaced at 6’ OC at the foundation perimeter with an embedment depth of 10 feet.