A five- story office building is to be built on a site underlain by moderately uniform soils. Bedrock is at a depth of over 200 m. This building will be 50 m wide and 85 m long, and the foundations will be founded at a depth of 1 m below the ground surface. Determine the required number and depth of the exploratory borings.

Q&A Education