A quality control engineer at a potato chip company tests the bag filling machine by weighing bags of potato chips. Not every bag contains exactly the same weight. But if more than 15% of bags are over-filled then they stop production to fix the machine. They define over-filled to be more than 1 ounce above the weight on the package. The engineer weighs 100 bags and finds that 21 of them are over-filled. He plans to test the hypotheses: H 0 : p

Q&A Education